Long Term 100 kVA Diesel Generator Hire Project Overview:
In December 2023, Target Hire began providing a 100kVA stage 5 generator with a 2000-litre external fuel tank and a 500-litre Ad-Blue tank for a four-storey modular pod home construction site welfare unit. This ongoing project ensures the unit has reliable, 24/7 power for lighting, heating, office operations, and hygiene areas.
Generator: 100kVA stage 5 emission-compliant generator
Accessories: 2000-litre external fuel tank, 500-litre Ad-Blue tank
The Challenge:
Target Hire’s Approach:
Our Services:
Supply and Delivery: We delivered the 100kVA stage 5 generator, along with external fuel and Ad-Blue tanks.
Fuel and Ad-Blue Lines: Installed connections between the tanks and the generator for seamless operation.
Ongoing Support: Regular maintenance and refueling coordination to ensure 24/7 prime power.
The Solution:
The 100kVA stage 5 generator has been powering the site’s welfare unit reliably, supporting various applications, including:
Lighting and Heating: Providing essential comfort for workers.
Office Operations: Supporting general electrical requirements for site management.
Hygiene Facilities: Ensuring fully functional hygiene areas for site staff.
Results:
Reliable Power: Continuous power supply for the welfare unit’s varied needs.
Compliance: Adherence to stage 5 emission standards in a city-center location.
Optimized Placement: Positioned for security and easy access to fuel and maintenance.
Conclusion:
Target Hire’s 100kVA stage 5 generator solution has provided the modular pod home construction site with reliable, compliant power for their welfare unit. This ongoing partnership ensures uninterrupted operations and demonstrates our ability to meet complex logistical and environmental challenges in urban construction projects.