500 kVA Diesel Generator Hire, For Tower Crane
In March 2024, Target Hire began supplying a 500kVA stage 5 generator with a 3000-litre external fuel tank and a 500-litre Ad-Blue tank for a CTL650/F-45 construction tower crane at a modular pod housing construction site. An additional 40kVA stage 5 generator was provided to power the crane’s aviation warning light during off-peak hours, ensuring compliance with safety regulations. This project is ongoing and represents a large-scale power solution tailored to the client’s needs.
Client:
Company Name: Modular Pod Home Construction Site
Project Date: Ongoing (Started March 2024)
Application: Powering construction tower crane and safety aviation light in Birmingham.
Project Details:
Generators:
*500kVA stage 5 generator
*40kVA stage 5 generator (for aviation lighting)
Accessories:
*3000-litre external fuel tank
*500-litre Ad-Blue tank
*125 amp MDU with three-phase socket outlets and 5 metres of cable
*32 amp MDU for 40kVA generator
*100kW load bank for the 500kVA generator
Duration:
Ongoing project
The Challenge:
This project posed several challenges:
Site Terrain: The construction site’s uneven and unforgiving ground complicated generator placement.
City-Central Location: Security considerations were paramount to prevent theft or tampering.
Load Spikes: The 500kVA generator, powering a large-scale motor (the crane), experienced load spikes. To address this, we supplied a 100kW load bank to stabilize the power flow.
Target Hire’s Approach:
After receiving the data sheet from the crane supplier specifying that a 500kVA generator was the minimum requirement, we ensured that the unit was stage 5 emission compliant to meet environmental standards. For the aviation warning light on top of the crane, we recommended and supplied a separate 40kVA generator to handle off-peak operations effectively.
The generators were positioned strategically for ease of refueling and maintenance while ensuring security in the urban environment.
Our Services:
Supply and Delivery:
Delivered and installed the 500kVA and 40kVA stage 5 generators, external fuel tanks, Ad-Blue tanks, and all required cabling and MDUs.
Fuel and Ad-Blue Lines: Installed secure and efficient connections between tanks and generators.
Load Bank Integration:
Supplied and integrated a 100kW load bank to prevent generator power spiking.
The Solution:
The 500kVA generator provided reliable power for the construction tower crane machinery and operational equipment, while the 40kVA generator powered the aviation warning light atop the crane during off-peak hours. The load bank ensured consistent power delivery without spikes.
Results:
Reliable Power: Continuous power for crane operations and safety measures.
Environmental Compliance: Stage 5 emission compliance for urban construction.
Optimised Stability: Load bank effectively managed power fluctuations.
Conclusion:
This ongoing project demonstrates Target Hire’s ability to provide tailored solutions for complex construction projects. The combination of high-capacity generators, fuel solutions, and load management systems ensures uninterrupted, compliant power for the modular pod housing construction site.